See What Your Coaching Adds Up To

Your season plans, drills, and evaluations are all built on the same skills.

  • Good sessions stay in your drill library instead of vanishing after Tuesday
  • Evaluate athletes against your own skill criteria, on your phone right after practice
  • €49/month flat rate. All features included, for every coach and athlete

For padel, tennis, basketball, soccer, volleyball, and any other sport you coach.

Start Your Free Trial

Explore every feature free for 14 days. No credit card required.

A coach's paper testing sheet, and the same testing day as it is recorded in Striveon.

Tennis fitness test

Date
10/12
Group
Comp. Squad
Tester
J. Wilson
Court
indoor hard
Tennis fitness test results written by hand on paper, 10/12, Comp. Squad
Name20 m4×5JumpOHFHBH
Ava3.326.051766.258.158.05
Ethan (circled by the coach)3.365.951916.458.608.00
Lucas3.406.381825.757.807.15
Lena3.495.881685.407.256.90

The Same Testing Day, in Striveon

The circled athlete's testing day as Striveon records it: 20 m sprint 3.36 s, 4 × 5 m shuttle 5.95 s, standing long jump 191 cm, and the overhead, forehand-side and backhand-side medicine ball throws at 6.45, 8.60 and 8.00 m.Striveon progress chart for the same athlete: standing long jump rising from 186 cm to 191 cm over four testing days.The same athlete's active goal in Striveon: break 3.3 s on the 20 m sprint, 45 percent achieved, currently at 3.36 s.
One skill, one season

One Skill, From the Season Plan to the Goal

One skill, followed through a season: planned, drilled, scored, charted, and turned into a goal.

  1. Plan

    The season plan puts Serve & Return in front of the whole academy for the season.

    Striveon season plan list, July 2026 to October 2026: Everyone, Serve & Return, month after month; Competition Squad, Tactics & Match Play.
  2. Pick the drills

    Link a drill to the skill set it trains, and the Serve & Return drills are one filter away.

    Striveon drill library filtered by the Serve & Return skill set: Drills, 2 of 11, the Serve & Return filter applied, listing Serve Placement Grid and Kick and Slice Second Serve with the start of each drill's goal.
  3. Evaluate

    Coaches rate Serve & Return skill by skill after practice, on a 1–10 scale. This round averages 5.5, the same 5.5 the chart and the goal show.

    Ethan Brown's third evaluation in Striveon, Progress Check by Sarah Mitchell: the Serve & Return card, average 5.5, First serve 5.
  4. See it add up

    Three rounds so far, 4.5 to 5.5, drawn straight from the evaluations. Nobody types a number in twice.

    Striveon skill set chart for Serve & Return, three evaluations over six weeks: a line rising from 4.5 to the current rating of 5.5, its last point highlighted with the tooltip Progress Check, Level 5.5.
  5. Reach the goal

    The serve goal moves with every new evaluation: from 4.5 toward 6.5, now at 5.5, 50 percent of the way.

    Ethan Brown's active goal in Striveon: First serve you can trust, Serve & Return from 4.5 toward 6.5, 9/4/2026 to 11/18/2026, 50 percent achieved, currently 5.5.

Walk into a parent meeting with a development curve instead of a gut feeling. A new assistant coach inherits the whole history.

From Coaches

The Difference Structure Makes

Clarity I haven’t found elsewhere

“Striveon has brought a clarity to planning sessions, running them and following up on players that I haven’t found in any other app. I can draw the drills, save them to the Drill Library, share them with players and attach notes, clips and test results straight to the player’s profile. Each player’s history stays together.

“Padel is its own sport in Striveon, so I don’t have to improvise session diagrams on a tennis court. I build the sessions directly for padel, and because they stay in the Drill Library, the club’s coaches are building up a shared library to pick from.

“You can tell it’s really made for coaches.”

Aati, Head Coach

Padel JKL(opens in new tab)

Jyväskylä, Finland

Everything in one place, no Excel

“Our club has used Striveon since launch day, and our experience has been nothing but positive. The platform has significantly simplified training planning, execution, and athlete development tracking.

“The best part is that everything is easily found in one place, no separate Excel sheets or calendars needed. Striveon’s support has been outstanding, and our improvement suggestions have been taken into account in platform updates.

“Our club gives Striveon a strong recommendation.”

Panu, Head Coach & Club Chairman

Periferian Padel(opens in new tab)

Joensuu, Finland

See It in Action

An interactive preview of the platform, opened on the test results behind the testing sheet above. Explore at your own pace.

Your interactive preview is loading
Before and After

Same Coaching Week. Less Chaos.

Without Striveon

Scattered notes, no clear picture of who's improving or quietly fading

With Striveon

Clear development paths for every athlete, plus a flag with the reason when someone starts to fade

Without Striveon

The season plan sits in a document nobody opens after the first month

With Striveon

You set the focus skills for each part of your season. The drills and evaluations you pick carry the same skills

Without Striveon

Ratings written down after practice, then never looked at again

With Striveon

Rate athletes against your own skill criteria. The ratings draw the progress chart and move each goal set on those skills

Without Striveon

Staring at a blank screen, trying to remember what worked last time

With Striveon

Sessions come together in minutes from your drill library and reusable templates

Born from the same challenges you face every day. See the story behind Striveon →

Striveon's player import wizard, step 2 of 4, Map Columns: the file's columns First name, Last name and Date of birth already matched to Striveon's fields.
Striveon's player import wizard, step 4 of 4, Done: Import complete, 12 new players created.
Step-by-Step

Get Started in Minutes, Not Hours

No complex setup and no IT department. Three steps take you from sign-up to your first planned session.

1.

Sign Up

Create your free account(opens in new tab). Interactive guides walk you through setup step by step.

2.

Build Your Teams

Bring your roster in from a file or paste it straight in, and Striveon sets up your season around your real players. Add each group's weekly times and its sessions appear on everyone's calendar automatically.

3.

Plan Your First Session

Build it from the drills your account starts with or from your own, then evaluate your athletes against your skill criteria after practice.

Transparent Pricing

No Hidden Fees. No Ads. No Surprises.

Unlike other platforms that charge per coach or per athlete, Striveon has one simple price for your entire organization.

€49/mo

Plus VAT where applicable

Unlimited coaches and athletes, every feature included

See full pricing details →
FAQ

Questions from Coaches Like You

Common questions from coaches exploring Striveon
Two young athletes celebrating with a high-five on a track, representing the success and achievement that comes from using Striveon's coaching platform

Start Your Free Trial, Everything Included

Try it on your own season for 14 days, with your roster, your drills, and your evaluations.